Commercial Proposal for Tooling

Once part design is ready we offer a techno commercial proposal with all the milestones and deliverables. It takes 1-2 working days to our engineers.

Inputs

Part Drawing
Tool life / Tool material
No. of cavities/ Production Target
Special surface treatments

Hongyi JIG

Project Management & Communication

Assuring customer’s project is produced to customer’s standards and requests. During this period we keep you updated about sending you the progress of tool manufacturing through an excel sheet and pictures of current process. It gives a clear idea about your project progress and confidence of time bound deliveries avoiding all the surprises.

Project management is the key to the success and quality of the products A Project Engineer who has rich knowledge in tooling and injection molding is appointed for each project. All of them have a good command of English. The project engineers is responsible to follow up tooling schedule and timely report to the customer on any issues and progress of the project he is handling. The project engineer also guarantees that customer’s technical requirement is followed.

Tooling Partners

Mold designers consider a variety of factors when selecting the mold metal including, machining ease, weld ability, abrasion resistance, hardness, corrosion resistance, and durability. Metals can range from the soft, low-melt-temperature alloys used in inexpensive, cast-metal, prototype molds to the porous metal used in vent inserts. Metals are chosen based not only on the cost, manufacturing, and performance requirements of the mold or component, but also on the experience and comfort level of the mold design and construction shop.

Assab
Buderus
Hongyi JIG
Injection mold
Daido
industeel
Finkl
LKM
baosteel

Hot Runners

mastip
molmaster
synvetive
Husky

Project management is the key to the success and quality of the products A Project Engineer who has rich knowledge in tooling and injection molding is appointed for each project. All of them have a good command of English. The project engineers is responsible to follow up tooling schedule and timely report to the customer on any issues and progress of the project he is handling. The project engineer also guarantees that customer’s technical requirement is followed.

Tooling with Skill and Accuracy

Our Project Engineers can also identify ways to cut-down program lead-times, while also avoiding program pitfalls through early problem detection for which we then work quickly to solve. The result: benchmark improvements for your product quality and process efficiency through total and proactive support for plastic molding engineering.

Plastic Injection Mold Engineering at HJIG is a vitally integrated part of our operation. Our engineering support provides design responsible advantages for mold design and plastic part design at whatever service level is needed. We can provide targeted assistance to support your total turnkey project

Injection Molds

  • Consumer Product
  • Automotive
  • Packaging
  • Electronics
  • Electrocal Appliances
  • Home Appliances
  • Medical

Rubber Molds

  • Compression molds
  • Rubber Injection
  • molds
  • Automative
  • Medical

Pressure Die Cast

  • Aluminum Die Cast
  • Zinc Die Cast
  • Automotive
  • Electricals

Fixtures

  • Inspection Fixtures
  • Clamping Fixtures
  • Guages for CMM